Prarencana Pabrik Pabrik Kopi Jahe 3 in 1 kapasitas 45000 kg / hari

Harlina, E.G. Lenny and Melani, Ita (2003) Prarencana Pabrik Pabrik Kopi Jahe 3 in 1 kapasitas 45000 kg / hari. Undergraduate thesis, Widya Mandala Catholic University Surabaya.

[thumbnail of ABSTRAK]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (220kB) | Preview
[thumbnail of BAB 1]
Preview
Text (BAB 1)
BAB 1.pdf

Download (222kB) | Preview
[thumbnail of BAB 2] Text (BAB 2)
BAB 2.pdf
Restricted to Registered users only

Download (102kB)
[thumbnail of BAB 3] Text (BAB 3)
BAB 3.pdf
Restricted to Registered users only

Download (210kB)
[thumbnail of BAB 4] Text (BAB 4)
BAB 4.pdf
Restricted to Registered users only

Download (83kB)
[thumbnail of BAB 5] Text (BAB 5)
BAB 5.pdf
Restricted to Registered users only

Download (394kB)
[thumbnail of BAB 6] Text (BAB 6)
BAB 6.pdf
Restricted to Registered users only

Download (697kB)
[thumbnail of BAB 7] Text (BAB 7)
BAB 7.pdf
Restricted to Registered users only

Download (285kB)
[thumbnail of BAB 8] Text (BAB 8)
BAB 8.pdf
Restricted to Registered users only

Download (972kB)
[thumbnail of BAB 9]
Preview
Text (BAB 9)
BAB 9.pdf

Download (101kB) | Preview
[thumbnail of LAMPIRAN]
Preview
Text (LAMPIRAN)
LAMPIRAN.pdf

Download (3MB) | Preview

Abstract

Prarencana pabrik kopi jahe 3 in 1 akan beroperasi secara continyu 24 jam/hari dan 330 hari/tahun dengan tahapan proses untuk pembuatan kopi instan, yaitu tahap pemanggangan, penghancuran, ekstraksi, pengepresan, pengeringan, sedangkan untuk produksi jahe, pencucian, pemotongan, ekstraksi dan pengeringan. Kemudian kedua hasil proses tersebut dicampur dengan gula sehingga diperoleh produk kopi jahe 3 in 1. Kapasitas : 45.000 kg/hari Produk : kopi jahe 3 in 1 3. Bahan baku : Biji kopi = 37.241,3793 kg/hari Jahe = 46.797,6603 kg/hari Gula pasir = 22.500 kg/hari 4. Utilitas : Air=660m3/hari Alum = 78 kg/hari Listrik = 750 kVA LNG = 126,24 tonlhari IDO = 61 ,47 L/hari 5. Lokasi : Karahg Pilang, Jawa Timur 6. Bentuk perusahaan : Perseroan terbatas 7. Struktur organisasi /: Garis dan staf 8. Jumlah tenaga kerja: 190 orang 9. Analisa ekonomi : A. Cara linear. Modal tetap (FCI) : Rp. 72.332.852.000,00 Modal kerja (WCI) : Rp. 94.594.550.000,00 lnvestasi total (TCI) : Rp. 166.927.402.000,00 Biaya produksi (TPC) : Rp. 530.387.073.000,00 Hasil penjualanltahun :Rp.588.726.600.000,00 Laba sebelum pajak :Rp. 58.339.527.000,00 laba sesudah pajak :Rp. 37.959.443.000,00 laju pengembalian modal sebelum pajak : 34,95 % laju pengembalian modal sesudah pajak : 22,74% Waktu pengembalian modal sebelum pajak : 2 tahun 8 bulan Waktu pengembalian modal sesudah pajak : 3 tahun 11 bulan Titik impas (BEP) : 48,76 % B. cara Discounted cash follow. masa konstruksi 2 tahun investasi total : Rp. 175.146.998.000,OO laju pengembalian modal sebelum pajak : 32,77 % Laju pengembalian modal sesudah pajak : 28,28 % Waktu pengembalian modal sebelum pajak: 3 tahun 1 bulan Waktu pengembalian modal sesudah pajak : 3 tahun 7 bulan Titik impas (BEP) : 44,39 %

Item Type: Thesis (Undergraduate)
Department: ["eprint_fieldopt_department_Faculty of engineering" not defined]
Subjects: Engineering
Engineering > Chemical Engineering
Divisions: Faculty of Engineering > Chemical Engineering Study Program
Depositing User: Users 32 not found.
Date Deposited: 24 Jun 2015 08:46
Last Modified: 24 Jun 2015 08:46
URI: http://repository.ukwms.ac.id/id/eprint/2791

Actions (login required)

View Item View Item