Prarencana Pabrik Kalium Sulfat (K2SO4) kapasitas 25 ton/hari

Meilany, . and Ayucitra, Aning (2003) Prarencana Pabrik Kalium Sulfat (K2SO4) kapasitas 25 ton/hari. Undergraduate thesis, Widya Mandala Catholic University Surabaya.

[thumbnail of ABSTRAK]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (177kB) | Preview
[thumbnail of BAB 1]
Preview
Text (BAB 1)
BAB 1.pdf

Download (162kB) | Preview
[thumbnail of BAB 2] Text (BAB 2)
BAB 2.pdf
Restricted to Registered users only

Download (136kB)
[thumbnail of BAB 3] Text (BAB 3)
BAB 3.pdf
Restricted to Registered users only

Download (196kB)
[thumbnail of BAB 4] Text (BAB 4)
BAB 4.pdf
Restricted to Registered users only

Download (91kB)
[thumbnail of BAB 5] Text (BAB 5)
BAB 5.pdf
Restricted to Registered users only

Download (426kB)
[thumbnail of BAB 6] Text (BAB 6)
BAB 6.pdf
Restricted to Registered users only

Download (769kB)
[thumbnail of BAB 7] Text (BAB 7)
BAB 7.pdf
Restricted to Registered users only

Download (265kB)
[thumbnail of BAB 8] Text (BAB 8)
BAB 8.pdf
Restricted to Registered users only

Download (84kB)
[thumbnail of BAB 9]
Preview
Text (BAB 9)
BAB 9.pdf

Download (138kB) | Preview
[thumbnail of LAMPIRAN]
Preview
Text (LAMPIRAN)
LAMPIRAN.pdf

Download (3MB) | Preview

Abstract

Prarencana pabrik Kalium Sulfat (K2S04) ini menggunakan bahan baku gypsum dan sylvinite. Prosesnya ialah dengan mereaksikan gypsum dan sylvinite dalam katalis larutan ammonia 25% (berat). Perencanaan operasi: Kapasitas produksi : 25 ton/hari Bahan baku : Gypsum dan sylvinite Konsumsi bahan baku : 1. Gypsum = 27.799,8612 kg/hari 2. Sylvinite = 59.906,0098 kg/hari Katalis : Larutan ammonia 25% Utilitas Air : 2.040,917 m3/hari Alum : 2.410,2156 kg/hari Zeolit : 3.389 kg Residu Fuel oil : 16.525,2666 1/bulan IDO : 41.3744 1/bulan Sistem opemsi : kontinyu Lokasi pabrik : Gresik, Jawa Timur Waktu operasi : 24 jam/hari dengan 330 hari masa kerja per tahun Jumlah karyawan : 196 orang Evaluasi ekonomi Fixed Capital Investment : Rp 245.910.001.900,00 Total Capital Investment : Rp 252.910.001.900,00 Total Production Cost : Rp 104.825.193.850,00 Rugi Kotor / Tahun : Rp 69.059.062.600,00 Berdasarkan hasil perencanaan di atas, maka pabrik K2S04 belum layak didirikan di Indonesia.

Item Type: Thesis (Undergraduate)
Department: ["eprint_fieldopt_department_Faculty of engineering" not defined]
Subjects: Engineering
Engineering > Chemical Engineering
Divisions: Faculty of Engineering > Chemical Engineering Study Program
Depositing User: Users 32 not found.
Date Deposited: 06 Oct 2015 07:08
Last Modified: 06 Oct 2015 07:08
URI: http://repository.ukwms.ac.id/id/eprint/3174

Actions (login required)

View Item View Item