Dewi, Vonny Cinthia and Rosita, Fenny (2003) Pra rencana Pabrik Gelatin dari serbuk tulang sapi kapasitas 10.000 ton/tahun. Undergraduate thesis, Widya Mandala Catholic University Surabaya.
Preview |
Text (ABSTRAK)
ABSTRAK.pdf Download (212kB) | Preview |
Preview |
Text (BAB 1)
BAB 1.pdf Download (231kB) | Preview |
Text (BAB 2)
BAB 2.pdf Restricted to Registered users only Download (168kB) |
|
Text (BAB 3)
BAB 3.pdf Restricted to Registered users only Download (189kB) |
|
Text (BAB 4)
BAB 4.pdf Restricted to Registered users only Download (249kB) |
|
Text (BAB 5)
BAB 5.pdf Restricted to Registered users only Download (758kB) |
|
Text (BAB 6)
BAB 6.pdf Restricted to Registered users only Download (701kB) |
|
Text (BAB 7)
BAB 7.pdf Restricted to Registered users only Download (317kB) |
|
Text (BAB 8)
BAB 8.pdf Restricted to Registered users only Download (542kB) |
|
Preview |
Text (BAB 9)
BAB 9.pdf Download (119kB) | Preview |
Preview |
Text (LAMPIRAN)
LAMPIRAN.pdf Download (5MB) | Preview |
Abstract
Pabrik gelatin ini direncanakan beroperasi secara kontinyu, 24 jam/hari dan 330 hari/tahun. Proses produksi gelatin secara singkat adalah tulang dihancurkan kemudian dimasukkan ke reaktor untuk direaksikan dengan HCl dengan tujuan menghilangkan garam-garam mineral dalam tulang sehingga diperoleh wet ossein. Wet ossein yang diperoleh dicuci dan diekstrak dalam ekstraktor pada suhu 75°C dan pH 2,25. Ekstrak wet ossein yang diperoleh adalah gelatin yang kemudian dikeringkan sampai menjadi bubuk. Kapasitas : 10.00 tahun Produk :Gelatin Bahab baku : Tulang = 12121,2 kg / hari HCl 35 % :( 16.688,53 It / hari Cat OH) : 18,72 kg / hari Utilitas : Steam = 54299,86 kg / hari Air : 1028,1907 m3/hari /hari Listrik : 210 kwh Bahan bakar : IDO sehanyak 380 It / bulan Lokasi : PIER Pasuruan, Jawa Timur Jumlah tcnaga kerja : 106 orang. Metode liniar Modal tetap (FCl) = Rp. 37.267.970.548,- Total investasi = Rp. 46.475.35 I.507,- Modal kerja (WCI) = Rp. 6.576.700.685,- Biaya produksi Produksi (TPC) = Rp. 36.549.649 .085,- Hasil penjualan / tahun = Rp. 50.000.148.000,- Laba kotar = Rp. 13.450.498.915,- Laba bersih = Rp. 8.781.574.295,- Laju pengembalian modal sebelum pajak = 30,68% Laju pengembalian modal sesudah pajak =,20,03% Waktu pengembalian modal sebelum pajak = 2 tahun 2 bulan. Waktu pengembalian modal sesudah pajak = 3 tahun. Titik impas (BEP) = 35,43% Metode Discounted Cash Flow Waktu konstruksi : 2 tahun. Total investasi rada akhir masa konstruksi = R P 46.475.351.507,- Laju pengembalian modal sebelum pajak 22,04% Laju pengembalian modal sesudah pajak = 14,05% Waktu pengembalian modal sebelum pajak = 4 tahun 1 bulan Waktu pengembalian modal sesudah pajak = 5 tahun 8 bulan Titik impas (BEP) = 35,43%
Item Type: | Thesis (Undergraduate) |
---|---|
Department: | ["eprint_fieldopt_department_Faculty of engineering" not defined] |
Subjects: | Engineering Engineering > Chemical Engineering |
Divisions: | Faculty of Engineering > Chemical Engineering Study Program |
Depositing User: | Users 32 not found. |
Date Deposited: | 06 Oct 2015 07:00 |
Last Modified: | 06 Oct 2015 07:00 |
URI: | http://repository.ukwms.ac.id/id/eprint/3225 |
Actions (login required)
View Item |