Prarencana pabrik pembuatan CaSO4 dari bittern kapasitas 75.000 kg/ hari

Soehendra, Fenny and Susan, Early (2003) Prarencana pabrik pembuatan CaSO4 dari bittern kapasitas 75.000 kg/ hari. Undergraduate thesis, Widya Mandala Catholic University Surabaya.

[thumbnail of ABSTRAK]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (1MB) | Preview
[thumbnail of BAB 1]
Preview
Text (BAB 1)
BAB 1.pdf

Download (893kB) | Preview
[thumbnail of BAB 2] Text (BAB 2)
BAB 2.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of BAB 3] Text (BAB 3)
BAB 3.pdf
Restricted to Registered users only

Download (347kB)
[thumbnail of BAB 4] Text (BAB 4)
BAB 4.pdf
Restricted to Registered users only

Download (349kB)
[thumbnail of BAB 5] Text (BAB 5)
BAB 5.pdf
Restricted to Registered users only

Download (2MB)
[thumbnail of BAB 6] Text (BAB 6)
BAB 6.pdf
Restricted to Registered users only

Download (5MB)
[thumbnail of BAB7] Text (BAB7)
BAB 7.pdf
Restricted to Registered users only

Download (3MB)
[thumbnail of BAB 8] Text (BAB 8)
BAB 8.pdf
Restricted to Registered users only

Download (3MB)
[thumbnail of BAB 9]
Preview
Text (BAB 9)
BAB 9.pdf

Download (1MB) | Preview
[thumbnail of LA MPIRAN] Text (LA MPIRAN)
LAMPIRAN.pdf
Restricted to Registered users only

Download (17MB)

Abstract

Bittern dari ladang penguapan garam dengan 20.69ºBe diinapkan secara kontinyu di Evaporator hingga 25ºBe dan terbentuk endapan CaS04.2H2O, dipisahkan dengan Filter Press, cake CaS04.2H2O, dipanaskan pada 220°C di Dryer, sedangkan filtratnya dikembalikan ke ladang penguapan garam untuk produksi garam NaCl. Bentuk perusahaan : Perseroan Terbatas (PT) Sistim organisasi : garis Sistim operasi : kontinyu Luas lahan : 19000m2 Pabrik bekerja : 24 jam/hari : 330hari/tahun Jumlah karyawan : 120 orang Bahan : Bittern : 17632828,094 kg/hari Utilitas : -Air : 75 m3/hari Listrik : 18000kw -Bahan bakar : 209000 liter/hari Analisa ekonomi : -Fixed Capital Investment (FCI) : Rp. 66.161.895.000 -Working Capital Investment (WCl) : Rp. 33.838.105.000 -Total Capital Investment (TCI) : Rp.l00.000.000.000 -Biaya Produksi Total : Rp.205.442.658.000 Metode Discounted Cash Flow : -Pay Out Period (POP) : 4,303 tahun -Rate of Return (ROR) : 20,392 % -Break Even Point (BEP) : 53,267 % Metode Linear : -Pay Out Period (POP) sebelum pajak : 1,72315 tahun -Pay Out Period (POP) sesudah pajak : 2,5168 tahun -Rate of Return (ROR) sebelum pajak : 52,305 % -Rate of Return (ROR) sesudah pajak : 34,005 % -Break Even Point (BEP) : 40,757 %

Item Type: Thesis (Undergraduate)
Department: ["eprint_fieldopt_department_Faculty Of Engineering" not defined]
Subjects: Engineering > Chemical Engineering
Divisions: Faculty of Engineering > Chemical Engineering Study Program
Depositing User: Users 32 not found.
Date Deposited: 12 Aug 2016 06:39
Last Modified: 12 Aug 2016 06:39
URI: http://repository.ukwms.ac.id/id/eprint/5713

Actions (login required)

View Item View Item