Fajar, Agus and Kusumawati, Dina (2003) Pra rencana Pabrik Dimethyl Ether (DME) dari gas alam kapasitas 15 ton/hari. Undergraduate thesis, Widya Mandala Catholic University Surabaya.
Preview |
Text (ABSTRAK)
ABSTRAK.pdf Download (126kB) | Preview |
Preview |
Text (BAB 1)
BAB 1.pdf Download (81kB) | Preview |
Text (BAB 2)
BAB 2.pdf Restricted to Registered users only Download (78kB) |
|
Text (BAB 3)
BAB 3.pdf Restricted to Registered users only Download (86kB) |
|
Text (BAB 4)
BAB 4.pdf Restricted to Registered users only Download (169kB) |
|
Text (BAB 5)
BAB 5.pdf Restricted to Registered users only Download (189kB) |
|
Text (BAB 6)
BAB 6.pdf Restricted to Registered users only Download (840kB) |
|
Text (BAB 7)
BAB 7.pdf Restricted to Registered users only Download (210kB) |
|
Text (BAB 8)
BAB 8.pdf Restricted to Registered users only Download (301kB) |
|
Preview |
Text (BAB 9)
BAB 9.pdf Download (122kB) | Preview |
Preview |
Text (LAMPIRAN)
LAMPIRAN.pdf Download (3MB) | Preview |
Abstract
Prarencana Pabrik Dimethyl Ether (DME) ini menggunakan bahan baku gas alam. Proses pembuatan DME ini melalui 2 tahap proses utama. Pada proses pertama untuk pembentukan methanol dengan menggunakan katalis CuO, ZnO dan Al2 03 sedangkan untuk proses berikutnya adalah pembentukan DME dengan menggunakan katalis Al2O, dan Si02. Perencanaanoperasi: Kapasitas produksi : 15 ton/hari Bahan baku : Metana dan gas alam Konsumsi bahan baku : 1227 m'/hari Katalis : CuO, ZnO, Al2O3, dan Si02 Utilitas Air : 320 m³ /hari Tawas : 23,5 kg/hari Zeolit : 80 kg /hari Fuel Oil: : 4747 lt/hari Sistem operasi : kontinyu Lokasi pabrik : Sumenep, Madura, Jawa Timur Waktu operasi : 24 jam/hari dengan 330 hari masa ketja dalam 1 Tahun Jumlah karyawan : 180 orang Evaluasi ekonomi : Masa konstruksi : 2 tahun Fixed Capital Investment : Rp. 65.064.469.000,- Total Capital Investment : Rp. 66.564.469.000,- Total Production Cost : Rp 34.609.725.760,- ¬Pay Out Period : 4,43 tahun Rate of Retum : 26,25 % Rate of Equity : 41,04 % Break Event Point : 44,08 % Berdasarkan hasil perencanaan di atas, maka pabrik DME ini layak untuk didirikan
Item Type: | Thesis (Undergraduate) |
---|---|
Department: | ["eprint_fieldopt_department_Faculty of engineering" not defined] |
Subjects: | Engineering Engineering > Chemical Engineering |
Divisions: | Faculty of Engineering > Chemical Engineering Study Program |
Depositing User: | Users 32 not found. |
Date Deposited: | 06 Oct 2015 07:01 |
Last Modified: | 06 Oct 2015 07:01 |
URI: | http://repository.ukwms.ac.id/id/eprint/3184 |
Actions (login required)
View Item |