Pra rencana Pabrik mixed xylene dari toluene kapasitas 25 ton/hari

Kurniawan, Lucky Lukito and Sugianto, Andre Putra (2003) Pra rencana Pabrik mixed xylene dari toluene kapasitas 25 ton/hari. Undergraduate thesis, Widya Mandala Catholic University Surabaya.

[thumbnail of ABSTRAK]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (234kB) | Preview
[thumbnail of BAB 1]
Preview
Text (BAB 1)
BAB 1.pdf

Download (215kB) | Preview
[thumbnail of BAB 2] Text (BAB 2)
BAB 2.pdf
Restricted to Registered users only

Download (126kB)
[thumbnail of BAB 3] Text (BAB 3)
BAB 3.pdf
Restricted to Registered users only

Download (93kB)
[thumbnail of BAB 4] Text (BAB 4)
BAB 4.pdf
Restricted to Registered users only

Download (198kB)
[thumbnail of BAB 5] Text (BAB 5)
BAB 5.pdf
Restricted to Registered users only

Download (469kB)
[thumbnail of BAB 6] Text (BAB 6)
BAB 6.pdf
Restricted to Registered users only

Download (610kB)
[thumbnail of BAB 7] Text (BAB 7)
BAB 7.pdf
Restricted to Registered users only

Download (288kB)
[thumbnail of BAB 8] Text (BAB 8)
BAB 8.pdf
Restricted to Registered users only

Download (522kB)
[thumbnail of BAB 9]
Preview
Text (BAB 9)
BAB 9.pdf

Download (170kB) | Preview
[thumbnail of LAMPIRAN]
Preview
Text (LAMPIRAN)
LAMPIRAN.pdf

Download (6MB) | Preview

Abstract

Pra rencana pabrik Mixed Xylene dengan proses disproporsionasi dan transalkylasi layak didirikan secara teknis maupun ekonomis. Spesifikasi proses yang dilakukan ditunjukkan dibawah ini : Uraian Proses: Bahan baku berupa toluene dan cumene direaksikan dalam reaktor fixed bed sehingga menghasilkan produk berupa mixed xylene dan benzene. Produk yang terbentuk kemudian dipisahkan dan dimurnikan dalam menara destilasi. Menara destilasi I digunakan untuk memisahkan benzene dari komponen lainnya, menara destilasi II digunakan untuk memisahkan toluene yang kemudian direcycle kembali ke reaktor, sedangkan menara destilasi III digunakan untuk memperoleh mixed xylene sebagai produk utama. Operasi: Rencana operasi : Kontinyu 24 jam per hari, 330 hari per tahun. Jenis proses : Toluene Disproporsionasi & Transalkylasi Produk : Mixed Xylene 99,02% berat dengan produk samping Benzene 91,93% berat Bahan Baku : Toluene 99% = 43,8959 ton/hari Cumene murni = 6,0453 ton/hari Utilitas : Air= 123,3750 m3/hari Steam = 33,0184 ton/hari Listrik = 85 kVa Lokasi Pabrik : Tangerang, Jawa Barat Bentuk Perusahaan : Perseroan Terbatas (PT) Analisa Ekonomi : Modal Tetap (FCI) : Rp.139.634.387.207 Modal Kerja (WCI) : Rp.24.64I.362.448 Investasi Total (TCI) : Rp.164.275.749.655 Biaya Produksi (TPC) : Rp.114290.006.738 Penjualan per tahun : Rp.178.978.154.954,97 Laba sebelum pajak : Rp.64.083.164.142,17 Laba sesudah pajak : Rp.41.692.806.692,41 Titik Impas (BEP) : 31,21% Metode Linear: Laju Pengembalian Modal sebelum pajak (ROR) : 39,01 % Laju Pengembalian Modal sesudah pajak (ROR) : 25,38% Waktu Pengembalian Modal sebelum pajak (POT) : 1,79 tahun Waktu Pengembalian Modal sesudah pajak (POT) : 2,50 tahun Metode Discounted Cash Flow: Laju Pengembalian Modal sebelum pajak (ROR) 32,09% Laju Pengembalian Modal sesudah pajak (ROR) 26,4% Laju Pengembalian Modal Sendiri sebelum pajak (ROE) 69,81% Laju Pengembalian Modal Sendiri sesudah pajak (ROE) 58,84% Waktu Pengembalian Modal sebelum pajak (POT) 3,05 tahun Waktu Pengembalian Modal sesudah pajak (POT) : 3,58 tahun

Item Type: Thesis (Undergraduate)
Department: ["eprint_fieldopt_department_Faculty of engineering" not defined]
Subjects: Engineering
Engineering > Chemical Engineering
Divisions: Faculty of Engineering > Chemical Engineering Study Program
Depositing User: Users 32 not found.
Date Deposited: 06 Oct 2015 07:05
Last Modified: 06 Oct 2015 07:05
URI: http://repository.ukwms.ac.id/id/eprint/3224

Actions (login required)

View Item View Item