Novianto, . and Yunita, Inggrid (2004) Prarencana pabrik tepung kentang kapasitas 1000 ton/tahun. Undergraduate thesis, Widya Mandala Catholic University Surabaya.
Preview |
Text (ABSTRAK)
ABSTRAK.pdf Download (2MB) | Preview |
Preview |
Text (BAB 1)
BAB 1.pdf Download (2MB) | Preview |
Text (BAB 2)
BAB 2.pdf Restricted to Registered users only Download (1MB) |
|
Text (BAB 3)
BAB 3.pdf Restricted to Registered users only Download (754kB) |
|
Text (BAB 4)
BAB 4..pdf Restricted to Registered users only Download (549kB) |
|
Text (BAB 5)
BAB 5.pdf Restricted to Registered users only Download (4MB) |
|
Text (BAB 6)
BAB 6.pdf Restricted to Registered users only Download (6MB) |
|
Text (BAB 7)
BAB 7.pdf Restricted to Registered users only Download (2MB) |
|
Text (BAB 8)
BAB 8.pdf Restricted to Registered users only Download (2MB) |
|
Preview |
Text (BAB 9)
BAB 9.pdf Download (1MB) | Preview |
Text (LAMPIRAN)
LAMPIRAN.pdf Restricted to Registered users only Download (19MB) |
Abstract
Tepung kentang dibuat dari buah kentang yang mentah sampai setengah matang dengan melalui proses pengupasan kulit, pemotongan , pemanasan dalam air panas pada 90º C selama 20 menit, perendaman didalam larutan 0,15% Sodium Bisulfite selama 10 menit. Proses terakhir yaitu pengeringan di Rotary Dryer sampai kadar air 7%, kemudian proses penghalusan sampai 80 mesh dan kemudian siap dikemas dan dijual. Proses Sistem operasi : Semi Kontinyu Waktu operasi : 24 jam/hari '= 300 hari/tahun Hasil Tepung kentang : 1000 ton/tahun Bahan baku dan tambahan Sodium Bisulfite : 0,3 kg/hari Utilitas -Air : 19,2 m³/hari -Listrik : 2000kVA -Bahan bakar : 12375 liter/hari Manajemen Bentuk perusahaan : Perseroan Terbatas Jumlah tenaga kerja : 150 orang Lokasi pabrik : Malang-Jawa Timur Luas area : 4170m² Analisa ekonomi -Masa konstruksi : 2 tahun -Modal Tetap (FCI) : Rp. 175.453.980.200 -Modal Kerja (WCI) : Rp. 30.962.467.100 -Biaya Produksi Total (TPC) : Rp. 123.619.608.000 -ROR sesudah pajak : 30,57% -ROR sebelum pajak : 34,10% -ROE sesudah pajak : 47,02% -ROE sebelum pajak : 51,83% POT sebelum pengembalian pinjaman : POT = 2 tahun 8 bulan - POT sesudah pengembalian pinjaman : POT = 3,00 tahun - BEP : 34,59 %
Item Type: | Thesis (Undergraduate) |
---|---|
Department: | ["eprint_fieldopt_department_Faculty of Engineering" not defined] |
Subjects: | Engineering > Chemical Engineering |
Divisions: | Faculty of Engineering > Chemical Engineering Study Program |
Depositing User: | Users 32 not found. |
Date Deposited: | 12 Aug 2016 03:09 |
Last Modified: | 12 Aug 2016 03:09 |
URI: | http://repository.ukwms.ac.id/id/eprint/6436 |
Actions (login required)
View Item |