Field practicalwork report Pt. Unilever Indonesia, TBK. Personal wash factory Surabaya June 26 2006 - August 28 2006

Santoso, Benny and Hendrawinata, Wiliam (2006) Field practicalwork report Pt. Unilever Indonesia, TBK. Personal wash factory Surabaya June 26 2006 - August 28 2006. Project Report (PKL, PKIPP, Magang D3, Praktik Kerja Profesi Apoteker, Profesi Guru, Profesi Ners dan Profesi Insiyur). Faculty of EngineeringChemical Engineering, Surabaya. (Unpublished)

[thumbnail of ABSTRAK]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (361kB) | Preview
[thumbnail of BAB 1]
Preview
Text (BAB 1)
BAB 1.pdf

Download (335kB) | Preview
[thumbnail of BAB 2] Text (BAB 2)
BAB 2.pdf
Restricted to Registered users only

Download (619kB)
[thumbnail of BAB 3] Text (BAB 3)
BAB 3.pdf
Restricted to Registered users only

Download (224kB)
[thumbnail of BAB 4] Text (BAB 4)
BAB 4.pdf
Restricted to Registered users only

Download (936kB)
[thumbnail of BAB 5] Text (BAB 5)
BAB 5.pdf
Restricted to Registered users only

Download (151kB)
[thumbnail of BAB 6] Text (BAB 6)
BAB 6.pdf
Restricted to Registered users only

Download (151kB)
[thumbnail of BAB 7] Text (BAB 7)
BAB 7.pdf
Restricted to Registered users only

Download (701kB)
[thumbnail of BAB 8] Text (BAB 8)
BAB 8.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of BAB 9] Text (BAB 9)
BAB 9.pdf
Restricted to Registered users only

Download (465kB)
[thumbnail of BAB 10] Text (BAB 10)
BAB 10.pdf
Restricted to Registered users only

Download (717kB)
[thumbnail of BAB 11]
Preview
Text (BAB 11)
BAB 11.pdf

Download (392kB) | Preview

Abstract

UnileveawasestaMisbedin~m5Decemkr1933.~yei~lader. on 15 kcember 1934, a map fac&ny named Lever's Ze@&kka N.V. was built In October 1936 a rnargatine ktoay with Blue Band brand was britt at dre same location and named Van Den Bergh's Fabrkken N.V.. Oa November IW1 Unilever todr over G. Dralle d c comp any in Surabaya and nsmed ha&&@jer Exploitate dm Colitni Fabrieken N.V. The Etlda Gibbs cosmetic fact~in1982aedToiletSoap~oryin1990inlZIlaghaSlnrsbayqdalso Walls ice cream fitdory in Cikamg in 1992 was established. The W a OiWs and Toilet Soap factoryarenowknownas PersooalCare~andRersoorlWash (PW) fkctoty, which are located on Jalan uoghrt Iodustri N 1 5-11, !hmbaya 60291. The head oflice of P.T. Unilever Imbaesia is located on Graba W v a a Jdan Jeodral Gatot Subron, Kav. 15, akarta Sehau 12930. P.T.UrrilevaWsta~edtoarpaoditsdbywgwoeed promds, soch as toothpaste, toilet soap, and cometic pImludx Tbese are prodoc& and its trade label which prodoaed by P.T. Unilever hkmsh fpdmies There are tbree hdmies which is owned by P.T. Unilever Iadaaesia lky are Cikarang Factory, Ekkasi (Fad and Noo-sosp Deterg@ Division), Kecap Cap Bango Factory, Subang, Jam Baml, and Ruugkut Factory, Smabeya (Personal Wasb and Pasanal Care Division). There are taro main steps of production process in P d W d E pauy Slnabaya of P.T. Unilever lodonesia, TMr. The firs step is processing uuit and the seumdoneisti&hingunit. Processing~mitamsistsofContinuousSoap~ (CSM)Imit,lyetrea~~andcnde~~mitaod~~mitarnsistS ofdryingunhand~~unit.First,therawmaterials(soapamtoils)~ reacted in ontinuous Soap M&hg (CSM) unit to produce soap and gtycad The s o a p a e d g t Y c e c 0 1 i s a l s o ~ d i n t t r i s n i t . T h e @ ~ ~ i s ~ d i s then ueated in lye hameat unit aud then in aude glycain unit and tk soap is treatedm~unit(dcyingunitandpadringbeunit)~ The utility unit m P.T. U u b a Indonesia Tbk, PemonaI Wash Edary, Surabaya consists of dedricity, steam, water, campaessed air, and amling media supply. Tbe necessiry of electricity m P d Was h Factory, P.T. U-er Indonesia Tbk, Suxabaya is supplied fhnn PLN, dne steam dammi is supplied by boileruuitwhi&amsistsoftbreefiretubeboiters. AllwaterwhichisusedmP.T. Unilevm Indonesia, Tbk Srwbaya is supplied by PDAM The aRnpressed air in P d Wash Factory is supplied by 5 compressor rmits and the codiag media supplyisdonebyresrigexatbnrnachines~use~fiigemnttoobtain&e condition needed. The Personal Wash Factory at P.T. Unilever lndoaesia has Waste Water TreamaentPlant(WWIP)unhthatprocess~wastewatmuntil~q~ and ttLen retreated in P.T. SIER Waste Treatment Unit. But now, waste water that has beentreatednotflowedto P.T. SERrmymore, butrecreatedinthenew WWTP, o the watea can be reused m the pmcess- The process occms m Waste Water Treatment Plant (WWTP) unit are cmgnlation, flacculation fitration equalision aeration , reverse osmosisthe water wisch is produced from waste and waste treatment plant (WWTP) Unit can be used for boiler feet water.

Item Type: Monograph (Project Report (PKL, PKIPP, Magang D3, Praktik Kerja Profesi Apoteker, Profesi Guru, Profesi Ners dan Profesi Insiyur))
Department: ["eprint_fieldopt_department_Faculty of Engineering" not defined]
Subjects: Engineering
Engineering > Chemical Engineering
Divisions: Faculty of Engineering > Chemical Engineering Study Program
Depositing User: Users 32 not found.
Date Deposited: 16 Jan 2015 01:29
Last Modified: 16 Jan 2015 01:29
URI: http://repository.ukwms.ac.id/id/eprint/747

Actions (login required)

View Item View Item